-
Petr Oros authored
BugLink: https://bugs.launchpad.net/bugs/1838467 [ Upstream commit 2e5db6eb ] Certain cards in conjunction with certain switches need a little more time for link setup that results in ethtool link test failure after offline test. Patch adds a loop that waits for a link setup finish. Changes in v2: - added fixes header Fixes: 4276e47e ("be2net: Add link test to list of ethtool self tests.") Signed-off-by: Petr Oros <poros@redhat.com> Reviewed-by: Ivan Vecera <ivecera@redhat.com> Signed-off-by: David S. Miller <davem@davemloft.net> Signed-off-by: Sasha Levin <sashal@kernel.org> Signed-off-by: Connor Kuehl <connor.kuehl@canonical.com> Signed-off-by: Khalid Elmously <khalid.elmously@canonical.com>
04cf29a3