• Jean-Paul Smets's avatar
    Business Path has beed splitted in 2 parts. A first part which is only used to... · 21f40032
    Jean-Paul Smets authored
    Business Path has beed splitted in 2 parts. A first part which is only used to control completation of trade phases and build process. A second part which is only used to define arrows, quantity shares and dates on amounts generated by amount generators. The first part is a predicate but no longer a Path (no arrow, no quantity, no delay, etc.). It is thus renamed to Business Link. The second part is a Path since it defines an Arrow, a quantity, a lead time, etc. It is thus renamed to Trade Model Path. 
    It is now time to review in detail all interfaces. In particular those interfaces on Business Link related to time management many no longer be needed since it is simpler to lookup simulation. However, time management must be handled at Business Process level as a helper method for rules which need to calculate dates based on Business Links and/or Trade Model Path.
    
    git-svn-id: https://svn.erp5.org/repos/public/erp5/sandbox/amount_generator@36465 20353a03-c40f-0410-a6d1-a30d3c3de9de
    21f40032
explainable.py 3.49 KB