> Introduced in [GitLab Ultimate](https://about.gitlab.com/pricing) 10.5.
An Epic within a group containing **Start date** and/or **Due date**
An Epic within a group containing **Start date** and/or **Due date**
can be visualized in a form of a timeline (e.g. a Gantt chart). The Epics Roadmap page
can be visualized in a form of a timeline (e.g. a Gantt chart). The Epics Roadmap page
...
@@ -21,6 +21,8 @@ Epics in the view can be sorted by:
...
@@ -21,6 +21,8 @@ Epics in the view can be sorted by:
Each option contains a button that can toggle the order between **ascending** and **descending**. The sort option and order will be persisted to be used wherever epics are browsed including the [epics list view](../epics/index.md).
Each option contains a button that can toggle the order between **ascending** and **descending**. The sort option and order will be persisted to be used wherever epics are browsed including the [epics list view](../epics/index.md).
Roadmaps can also be [visualized inside an epic](../epics/index.md#roadmap-in-epics).
## Timeline duration
## Timeline duration
Starting with [GitLab Ultimate][ee] 11.0, Roadmap supports three different date ranges; Quarters, Months (Default) and Weeks.
Starting with [GitLab Ultimate][ee] 11.0, Roadmap supports three different date ranges; Quarters, Months (Default) and Weeks.
...
@@ -60,5 +62,3 @@ and due date. If an epic doesn't have a due date, the timeline bar fades
...
@@ -60,5 +62,3 @@ and due date. If an epic doesn't have a due date, the timeline bar fades
away towards the future. Similarly, if an epic doesn't have a start date, the
away towards the future. Similarly, if an epic doesn't have a start date, the
timeline bar becomes more visible as it approaches the epic's due date on the
timeline bar becomes more visible as it approaches the epic's due date on the