1. 14 Nov, 2018 1 commit
  2. 30 Oct, 2018 1 commit
  3. 03 Sep, 2018 1 commit
  4. 31 Aug, 2018 1 commit
  5. 29 Aug, 2018 1 commit
  6. 10 Aug, 2018 1 commit
  7. 31 Jul, 2018 1 commit
  8. 30 Jul, 2018 2 commits
  9. 22 Jun, 2018 1 commit
  10. 27 Apr, 2018 1 commit
  11. 27 Mar, 2018 1 commit
  12. 16 Mar, 2018 2 commits
  13. 16 Jun, 2017 1 commit
  14. 02 Jun, 2017 1 commit
  15. 30 May, 2017 1 commit
  16. 16 May, 2017 2 commits
    • Rafael Monnerat's avatar
      slaprunner: Define backup wait time for resilience · 53a52b28
      Rafael Monnerat authored
        In order to make an resilient backup, resilience stack wait for the internal backup finishes,
        before proceed to notify the pbs. This commit keeps the default behaviour (wait for 10 min w/o changes),
        however allows test software release adopt a much shorter waiting time (1min).
      
        With this commit we can accelerate resilience tests in several minutes.
      53a52b28
    • Rafael Monnerat's avatar
      stack/resilience: use rendered instead output · e34c7254
      Rafael Monnerat authored
        This fix the real location of the log after use logrotate stack.
      e34c7254
  17. 05 May, 2017 1 commit
    • Rafael Monnerat's avatar
      slaprunner: Allow set software-root via parameters · eec7c81e
      Rafael Monnerat authored
        Allow set software-root via parameters allow the webrunner inside a erp5testnode,
        recover the the previous builds from previous resilient tests, and only update (instead build from scratch)
        This is a typical usage on the webrunner (keep updating SR), so there is no
        problem on use this approach on erp5testnode tests.
      eec7c81e
  18. 12 Apr, 2017 1 commit
  19. 11 Apr, 2017 2 commits
  20. 10 Apr, 2017 3 commits
  21. 21 Mar, 2017 1 commit
  22. 15 Mar, 2017 1 commit
  23. 10 Mar, 2017 1 commit
  24. 21 Feb, 2017 1 commit
  25. 13 Feb, 2017 1 commit
  26. 24 Nov, 2016 3 commits
  27. 21 Nov, 2016 1 commit
  28. 15 Nov, 2016 5 commits