net/mlx5: E-switch, Devcom, sync devcom events and devcom comp register
devcom events are sent to all registered component. Following the cited patch, it is possible for two components, e.g.: two eswitches, to send devcom events, while both components are registered. This means eswitch layer will do double un/pairing, which is double allocation and free of resources, even though only one un/pairing is needed. flow example: cpu0 cpu1 ---- ---- mlx5_devlink_eswitch_mode_set(dev0) esw_offloads_devcom_init() mlx5_devcom_register_component(esw0) mlx5_devlink_eswitch_mode_set(dev1) esw_offloads_devcom_init() mlx5_devcom_register_component(esw1) mlx5_devcom_send_event() mlx5_devcom_send_event() Hence, check whether the eswitches are already un/paired before free/allocation of resources. Fixes: 09b27846 ("net: devlink: enable parallel ops on netlink interface") Signed-off-by: Shay Drory <shayd@nvidia.com> Reviewed-by: Mark Bloch <mbloch@nvidia.com> Signed-off-by: Saeed Mahameed <saeedm@nvidia.com>
Showing
Please register or sign in to comment