RDMA/bnxt_re: Fixing the Control path command and response handling
Fixing a concurrency issue with creq handling. Each caller was given a globally managed crsq element, which was accessed outside a lock. This could result in corruption, if lot of applications are simultaneously issuing Control Path commands. Now, each caller will provide its own response buffer and the responses will be copied under a lock. Also, Fixing the queue full condition check for the CMDQ. As a part of these changes, the control path code is refactored to remove the code replication in the response status checking. Signed-off-by: Devesh Sharma <devesh.sharma@broadcom.com> Signed-off-by: Selvin Xavier <selvin.xavier@broadcom.com> Signed-off-by: Doug Ledford <dledford@redhat.com>
Showing
This diff is collapsed.
This diff is collapsed.
This diff is collapsed.
Please register or sign in to comment