Try to adhere to scheduling deadlines when running callbacks
This should result in the loop getting serviced more often when there are many callbacks to run. This is hooked up to `getswitchinterval` to allow control. We check the interval every 50 callbacks. That's hardcoded, which I don't like, but the 1000 callback number was hardcoded before, so it's not really much of a change. A future extension would be to calculate the check number dynamically based on dividing the switch interval. I don't have a specific test case for this change because I'm a little fried, but all the other tests pass. I did manually verify that the example in #1071 matches expectations---that could probably be turned into a test case with some work. Fixes #1072 Fixes #1071 Fixes #1068
Showing
This diff is collapsed.
Please register or sign in to comment