-
Peter Zijlstra authored
Impact: scheduling order fix for group scheduling For each level in the hierarchy, set the buddy to point to the right entity. Therefore, when we do the hierarchical schedule, we have a fair chance of ending up where we meant to. Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl> Acked-by: Mike Galbraith <efault@gmx.de> Signed-off-by: Ingo Molnar <mingo@elte.hu>
02479099