-
Andy Shevchenko authored
BugLink: https://bugs.launchpad.net/bugs/1878246 commit b9f96020 upstream. Under some circumstances, i.e. when test is still running and about to time out and user runs, for example, grep -H . /sys/module/dmatest/parameters/* the iterations parameter is not respected and test is going on and on until user gives echo 0 > /sys/module/dmatest/parameters/run This is not what expected. The history of this bug is interesting. I though that the commit 2d88ce76 ("dmatest: add a 'wait' parameter") is a culprit, but looking closer to the code I think it simple revealed the broken logic from the day one, i.e. in the commit 0a2ff57d ("dmaengine: dmatest: add a maximum number of test iterations") which adds iterations parameter. So, to the point, the conditional of checking the thread to be stopped being first part of conjunction logic prevents to check iterations. Thus, we have to always check both conditions to be able to stop after given iterations. Since it wasn't visible before second commit appeared, I add a respective Fixes tag. Fixes: 2d88ce76 ("dmatest: add a 'wait' parameter") Cc: Dan Williams <dan.j.williams@intel.com> Cc: Nicolas Ferre <nicolas.ferre@microchip.com> Signed-off-by: Andy Shevchenko <andriy.shevchenko@linux.intel.com> Acked-by: Nicolas Ferre <nicolas.ferre@microchip.com> Link: https://lore.kernel.org/r/20200424161147.16895-1-andriy.shevchenko@linux.intel.comSigned-off-by: Vinod Koul <vkoul@kernel.org> Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org> Signed-off-by: Ian May <ian.may@canonical.com> Signed-off-by: Kleber Sacilotto de Souza <kleber.souza@canonical.com>
2a7ca266