-
Brenda J. Butler authored
With option -P, the test script will pause just before the post_suite functions are called. This allows the tester to inspect the system before it is torn down. Signed-off-by: Brenda J. Butler <bjb@mojatatu.com> Signed-off-by: David S. Miller <davem@davemloft.net>
2b3905de