-
Neerav Parikh authored
When there are DCB configuration changes based on DCBX the firmware suspends the port's Tx and generates an event to the PF. The PF is then responsible to reconfigure the PF VSIs and switching topology as per the updated DCB configuration and then resume the port's Tx by calling the "Resume Port Tx" AQ command. This patch adds this call to the flow that handles DCB re-configuration in the PF. Change-ID: I5b860ad48abfbf379b003143c4d3453e2ed5cc1c Signed-off-by: Neerav Parikh <neerav.parikh@intel.com> Tested-By: Jack Morgan <jack.morgan@intel.com> Signed-off-by: Jeff Kirsher <jeffrey.t.kirsher@intel.com>
2fd75f31