-
Rumen G. Bogdanovski authored
With this patch the synced connections are created with their real state, which can be changed on the next synchronizations if necessary. This way on fail-over all the connections will be treated according to their actual state, causing no scheduling problems (the active and the nonactive connections have different weights in the schedulers). The backwards compatibility is preserved and the existing tools will show the true connection states even on the backup director. Signed-off-by: Rumen G. Bogdanovski <rumen@voicecho.com> Signed-off-by: Simon Horman <horms@verge.net.au> Signed-off-by: David S. Miller <davem@davemloft.net>
b209639e