-
Avraham Stern authored
When the interface that is requesting an FTM measurement is connected to a BSS, it is possible that the FTM request was originated by an RRM request from the AP. In this case the station needs to report the measurement start time in terms of the TSF of the AP. Since there is no indication in the FTM request itself if the TSF is needed, always report the TSF if the station is associated. Signed-off-by: Avraham Stern <avraham.stern@intel.com> Signed-off-by: Luca Coelho <luciano.coelho@intel.com>
cec2d4f6