-
Yoshihiro Shimoda authored
The commit 5a36d6bc ("mmc: core: Add DT-bindings for MMC_CAP2_FULL_PWR_CYCLE") added the "full-pwr-cycle" property which is possible to perform a full power cycle of the card at any time. However, some environment (like r8a77951-salvator-xs) is possible to perform a full power cycle of the card in suspend via firmware (PSCI on arm-trusted-firmware). So, in worst case, since we are not doing a graceful shutdown of the eMMC device (just cut VCCQ while the eMMC is "sleeping") in suspend, it could lead to internal data corruptions. So, add MMC_CAP2_FULL_PWR_CYCLE_IN_SUSPEND to do a graceful shutdown which issues Power Off notification before entering system suspend. Signed-off-by: Yoshihiro Shimoda <yoshihiro.shimoda.uh@renesas.com> Link: https://lore.kernel.org/r/1594123122-13156-3-git-send-email-yoshihiro.shimoda.uh@renesas.comSigned-off-by: Ulf Hansson <ulf.hansson@linaro.org>
ec02760b