net: hns: Fix loopback test failed at copper ports
BugLink: https://bugs.launchpad.net/bugs/1836668 [ Upstream commit 2e1f1648 ] When doing a loopback test at copper ports, the serdes loopback and the phy loopback will fail, because of the adjust link had not finished, and phy not ready. Adds sleep between adjust link and test process to fix it. Signed-off-by: Yonglong Liu <liuyonglong@huawei.com> Signed-off-by: David S. Miller <davem@davemloft.net> Signed-off-by: Sasha Levin <sashal@kernel.org> Signed-off-by: Khalid Elmously <khalid.elmously@canonical.com> Signed-off-by: Kleber Sacilotto de Souza <kleber.souza@canonical.com>
Showing
Please register or sign in to comment