sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target
This patch adds a check that prevents futile attempts to move DL tasks to a CPU with active tasks of equal or earlier deadline. The same behavior as commit 80e3d87b ("sched/rt: Reduce rq lock contention by eliminating locking of non-feasible target") for rt class. Signed-off-by: Wanpeng Li <wanpeng.li@linux.intel.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Andrew Morton <akpm@linux-foundation.org> Cc: Borislav Petkov <bp@alien8.de> Cc: H. Peter Anvin <hpa@zytor.com> Cc: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Thomas Gleixner <tglx@linutronix.de> Link: http://lkml.kernel.org/r/1431496867-4194-3-git-send-email-wanpeng.li@linux.intel.comSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
Please register or sign in to comment