sched/deadline: Zero out positive runtime after throttling constrained tasks
When a contrained task is throttled by dl_check_constrained_dl(), it may carry the remaining positive runtime, as a result when dl_task_timer() fires and calls replenish_dl_entity(), it will not be replenished correctly due to the positive dl_se->runtime. This patch assigns its runtime to 0 if positive after throttling. Signed-off-by: Xunlei Pang <xlpang@redhat.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Acked-by: Daniel Bristot de Oliveira <bristot@redhat.com> Cc: Juri Lelli <juri.lelli@arm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Luca Abeni <luca.abeni@santannapisa.it> Cc: Mike Galbraith <efault@gmx.de> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Steven Rostedt <rostedt@goodmis.org> Cc: Thomas Gleixner <tglx@linutronix.de> Fixes: df8eac8c ("sched/deadline: Throttle a constrained deadline task activated after the deadline) Link: http://lkml.kernel.org/r/1494421417-27550-1-git-send-email-xlpang@redhat.comSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
Please register or sign in to comment