sched/topology: Set correct NUMA topology type
With the following commit: 051f3ca0 ("sched/topology: Introduce NUMA identity node sched domain") the scheduler introduced a new NUMA level. However this leads to the NUMA topology on 2 node systems to not be marked as NUMA_DIRECT anymore. After this commit, it gets reported as NUMA_BACKPLANE, because sched_domains_numa_level is now 2 on 2 node systems. Fix this by allowing setting systems that have up to 2 NUMA levels as NUMA_DIRECT. While here remove code that assumes that level can be 0. Signed-off-by: Srikar Dronamraju <srikar@linux.vnet.ibm.com> Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org> Cc: Andre Wild <wild@linux.vnet.ibm.com> Cc: Heiko Carstens <heiko.carstens@de.ibm.com> Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Mel Gorman <mgorman@techsingularity.net> Cc: Michael Ellerman <mpe@ellerman.id.au> Cc: Peter Zijlstra <peterz@infradead.org> Cc: Rik van Riel <riel@surriel.com> Cc: Suravee Suthikulpanit <suravee.suthikulpanit@amd.com> Cc: Thomas Gleixner <tglx@linutronix.de> Cc: linuxppc-dev <linuxppc-dev@lists.ozlabs.org> Fixes: 051f3ca0 "Introduce NUMA identity node sched domain" Link: http://lkml.kernel.org/r/1533920419-17410-1-git-send-email-srikar@linux.vnet.ibm.comSigned-off-by: Ingo Molnar <mingo@kernel.org>
Showing
Please register or sign in to comment