-
Rémy Coutable authored
Skipped jobs should be considered successful ## What does this MR do? If all jobs in previous stage are all skipped, the next stage should consider previous stage succeeded. ## Why was this MR needed? Since for now we consider all manual jobs if skipped, should not block the next stage from running. Closes #22598 See also #20342 (because this merge request conflicts with it) See merge request !6604
4dc61dc7
To find the state of this project's repository at the time of any of these versions, check out
the tags.