• Furkan Ayhan's avatar
    Store scheduling type of builds · f810e313
    Furkan Ayhan authored
    We decided to store information about how a build is created.
    It can either be stage or dag.
    Stage is regular scheduling type.
    When a job has "needs" keyword, it will have "dag" scheduling type.
    f810e313
bridge_spec.rb 5.94 KB