Commit f0607059 authored by bikebilly's avatar bikebilly

Update regression labeling

parent 07d1a7f0
...@@ -253,8 +253,9 @@ When a regression is found: ...@@ -253,8 +253,9 @@ When a regression is found:
1. Evaluate the priority and add a [Priority label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-priority-labels-p1-p2-p3-p4) 1. Evaluate the priority and add a [Priority label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-priority-labels-p1-p2-p3-p4)
1. Schedule the issue in order to get it fixed as soon as possible, based on severity and priority, following these guidelines: 1. Schedule the issue in order to get it fixed as soon as possible, based on severity and priority, following these guidelines:
- If the regression is ~S1 or ~S2, set the current milestone - If the regression is ~S1 or ~S2, set the current milestone
- If the regression was introduced in a RC of the current release, label with ~Deliverable - If the regression was introduced in a RC of the current release, label with ~Deliverable
- If the regression was introduced in the previos release, label with ~"Next Patch Release" - If the regression was introduced in the previos release, label with ~"Next Patch Release"
- If the regression is ~S3 or ~S4, it can be scheduled for later milestones
When a new issue is found, the fix should start as soon as possible. You can When a new issue is found, the fix should start as soon as possible. You can
ping the Engineering Manager or the Product Manager for the relative area to ping the Engineering Manager or the Product Manager for the relative area to
......
Markdown is supported
0%
or
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment