- 06 Feb, 2023 35 commits
-
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
We need to be able to see the future without auto planned orders, else how are we going to update them?
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Arnaud Fontaine authored
erp5_mrp: Copy price_currency to Manufacturing Execution and Production Packing List (PSA specific?). In PSA for ME: Problem Report is created from a ME which then build a Returned IPL from scratch copying properties from the ME. After this Returned IPL is root-expanded, Real Time Inventory Accounting Rule is expanded too and requires price_currency.
-
Arnaud Fontaine authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
As a matter of fact immediateReindexObject doesn't call reindexObject on the object
-
Cédric Le Ninivin authored
buidler: Add tmp fix/workaround on movement order builder: Use periodicity to determinate start date builder mixin: Take into account supply date range before create movement builder: Hackish immediate reindex of order to work for parallel build builder: use dedicated script to evaluate min stock builder: autoPlan only if possible builder: Reference of order line is reference of resource line builder: include order delay and effective date builder: fixup add missing part for effective date builder: Tweak and fix supply builder builder: Fixup supply builder builder: immediate reindex delivery on creation builder: use _edit on delivery to only reindex modification builder: Supply builder work with period builder: Supply builder improved builder: use flow unit for min stock calculation builder: Supply Builder Fix future inventory for parts not activated yet builder: Supply builder do not create movement for resources that won't be consumed in the future
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
SimulationTool: getNextAlertInventoryDate can look for the lowest invetory inferior to the reference quantity
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
- 03 Feb, 2023 3 commits
-
-
Jérome Perrin authored
These properties are supposed to never be set on ERP5 documents. See https://lab.nexedi.com/nexedi/erp5/blob/34f4ae37/product/ERP5Type/Constraint/PropertyTypeValidity.py#L65
-
Jérome Perrin authored
This properties are not used, no need to have them exported
-
Jérome Perrin authored
-
- 02 Feb, 2023 1 commit
-
-
Yusei Tahara authored
-
- 30 Jan, 2023 1 commit
-
-
Jérome Perrin authored
If there's an error during the --save setup, we don't need to run the --load steps, because test failed already and if they don't fail in --load step, it would be a case where some errors are not reported.
-