Skip to content

GitLab

  • Projects
  • Groups
  • Snippets
  • Help
    • Loading...
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
    • Contribute to GitLab
  • Sign in / Register
S slapos.core
  • Project overview
    • Project overview
    • Details
    • Activity
    • Releases
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
  • Labels
    • Labels
  • Merge requests 27
    • Merge requests 27
  • CI/CD
    • CI/CD
    • Pipelines
    • Jobs
    • Schedules
  • Operations
    • Operations
    • Environments
  • Analytics
    • Analytics
    • CI/CD
    • Repository
    • Value Stream
  • Members
    • Members
  • Activity
  • Graph
  • Jobs
  • Commits
Collapse sidebar
  • nexedi
  • slapos.core
  • Merge requests
  • !178

Merged
Created Jan 16, 2020 by Jérome Perrin@jeromeOwner

testcase: give more time for instance destruction.

  • Overview 3
  • Commits 1
  • Pipelines 1
  • Changes 1

During teardown, we sometimes have errors that processes are still running after being stopped, something like:

Fault: <Fault 91: 'STILL_RUNNING: TestTelegraf-0'>

This is because we only retried slapos node report two times, but slapos node report tells supervisor to stop processes without waiting and when processes takes time to stop, this is sometimes not enough. Increase to retry up to 10 times by default.

Assignee
Assign to
Reviewer
Request review from
None
Milestone
None
Assign milestone
Time tracking
Source branch: fix/testcase_wait_for_report
GitLab Nexedi Edition | About GitLab | About Nexedi | 沪ICP备2021021310号-2 | 沪ICP备2021021310号-7