- 15 Mar, 2024 21 commits
-
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Arnaud Fontaine authored
erp5_mrp: Copy price_currency to Manufacturing Execution and Production Packing List (PSA specific?). In PSA for ME: Problem Report is created from a ME which then build a Returned IPL from scratch copying properties from the ME. After this Returned IPL is root-expanded, Real Time Inventory Accounting Rule is expanded too and requires price_currency.
-
Arnaud Fontaine authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
As a matter of fact immediateReindexObject doesn't call reindexObject on the object
-
Cédric Le Ninivin authored
buidler: Add tmp fix/workaround on movement order builder: Use periodicity to determinate start date builder mixin: Take into account supply date range before create movement builder: Hackish immediate reindex of order to work for parallel build builder: use dedicated script to evaluate min stock builder: autoPlan only if possible builder: Reference of order line is reference of resource line builder: include order delay and effective date builder: fixup add missing part for effective date builder: Tweak and fix supply builder builder: Fixup supply builder builder: immediate reindex delivery on creation builder: use _edit on delivery to only reindex modification builder: Supply builder work with period builder: Supply builder improved builder: use flow unit for min stock calculation builder: Supply Builder Fix future inventory for parts not activated yet builder: Supply builder do not create movement for resources that won't be consumed in the future
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
SimulationTool: getNextAlertInventoryDate can look for the lowest invetory inferior to the reference quantity
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
Cédric Le Ninivin authored
-
- 13 Mar, 2024 3 commits
-
-
Rafael Monnerat authored
See merge request nexedi/erp5!1902
-
Rafael Monnerat authored
-
Rafael Monnerat authored
-
- 11 Mar, 2024 5 commits
-
-
Georgios Dagkakis authored
-
Georgios Dagkakis authored
-
Georgios Dagkakis authored
-
Georgios Dagkakis authored
anyway, what happened is stored in the HTTP Exchange
-
Georgios Dagkakis authored
this BT is to hold code and configuration related to the Interface with DQE data quality services
-
- 08 Mar, 2024 3 commits
-
-
Romain Courteaud authored
-
Romain Courteaud authored
-
Kazuhiko Shiozaki authored
-
- 07 Mar, 2024 2 commits
-
-
Rafael Monnerat authored
The administrator can enable it back clicking in a button, this can prevent massive email sending from unattended sites (development for example) related to test failures or average development
-
Kazuhiko Shiozaki authored
-
- 06 Mar, 2024 1 commit
-
-
Léo-Paul Géneau authored
See merge request !1897 * change property drone_dict into function getDroneDict * add timestamp to getCurrentPosition return value * add timestamp to drone_info
-
- 05 Mar, 2024 4 commits
-
-
Jérome Perrin authored
-
Jérome Perrin authored
When we --load, the sql dump is supposed to be up to date, we don't need to update translation table every time. This is mainly to solve an issue that it might not be possible to run ERP5Site_updateTranslationTable at this point, with testUpgradeInstanceWithOldDataFs this script uses a print statement, which causes a SyntaxError.
-
Julien Muchembled authored
Unit test written by Rafael Monnerat. See commit 3d7d6d5e.
-
Léo-Paul Géneau authored
See merge request !1894 * set _game_duration as an unix epoch * provide timestamp to onStart function * add max_command_frequency, if direction commands (setTargetCoordinates and loiter) are send more often than max frenquency the drone crashes
-
- 04 Mar, 2024 1 commit
-
-
Rafael Monnerat authored
See merge request nexedi/erp5!1895
-